Project Showcase · Aquatic Facility · Ottawa
Canterbury Pool
A complete rebuild of an institutional pool — from bare concrete to swim-ready. Scroll to watch every layer go in.
Project Showcase · Aquatic Facility · Ottawa
A complete rebuild of an institutional pool — from bare concrete to swim-ready. Scroll to watch every layer go in.
Project Details
Institutional aquatic facility, Ottawa. Full tile system rebuild of the pool basin and surrounding decks, for general contractor Graebeck Construction. Completed September 2026.
← All projectsThe Work
A pool tile system is three layers, and each one has to be right before the next goes on. We installed more than 10,000 sq ft of each, managed on site by Arda Cinar, for owner the City of Ottawa and general contractor Graebeck Construction. How we work with general contractors.
Screed rails were set in a grid across the basin and decks, and the mortar bed was packed and floated to them. That bed sets the slopes and flat planes every tile sits on, so a pool this size is only as good as its screeding.
The whole basin was coated in a waterproofing membrane before any tile went down. Under constant water, the membrane is what keeps water out of the setting bed and the concrete behind it. Read more in our liquid vs sheet membrane guide.
More than 10,000 sq ft of mosaic covers the floor, walls and decks. Lane lines, end-wall targets, metre marks and depth markings are set into the tile pattern itself, so they never need repainting.
On Site
Photos from the Canterbury Pool site during the rebuild.









Gallery
From mortar-bed channels to the first fill. Tap any photo to view it full size.